1 |
Testing of Cement |
Dr. Shashank Bhatra |
Dr. Muskan Mayank |
M/s Rahee Infratech Limited |
5900/- |
Completed |
2023-2024 |
|
2 |
Testing of River Water |
Dr. Laiju A. R. |
Dr. Muskan Mayank |
M/s Rahee Infratech Limited |
44,604/- |
Completed |
2023-2024 |
|
3 |
Kanvashram- Retaining wall vetting |
Dr. Amardeep |
Dr. Devesh Punera |
M/s Sincere Architecture Pvt Ltd |
59000/- |
Completed |
2023-2024 |
|
4 |
ROB Vetting |
Dr. Amardeep |
- |
Welspun Pvt Ltd |
200000/- |
Completed |
2023-2024 |
|
5 |
Vetting of Structural Design and Drawing of Barrack and Dining Block at Supremen Courst of India |
Dr. Shashi Narayan |
- |
M/s Keslec Design Solution |
20,060/- |
Completed |
2023-2024 |
|
6 |
Vetting of Structural Design and Drawing of various school sites Phase -I |
Dr. Shashi Narayan |
Mr. Amardeep |
M/s Keslec Design Solution |
9,38,100/- |
Completed |
2023-2024 |
|
7 |
Technical vetting/approval for GFC Design and Drawing of hospital buildings Lakhimpur and Bulandshahar |
Dr. Shashi Narayan |
Dr. A.K. Anupam |
M/s NKG Infrastructure |
7,08,000/- |
Completed |
2023-2024 |
|
8 |
Technical vetting/approval for GFC Design and Drawing of ARS, Buland |
Dr. Shashi Narayan |
Dr. A.K. Anupam |
M/s RCC Developers Ltd |
1,41,000/- |
Completed |
2023-2024 |
|
9 |
Compression test of concrete cubes for 2.70 MLD STP Marwari |
Dr. Shashi Narayan |
Dr. Amardeep |
M/s Eco Protection Engineers Pvt. Ltd |
11,800/- |
Completed |
2023-2024 |
|
10 |
Consultancy Charges for Vetting of structural Drawing for tension fabric |
Dr. Shashi Narayan |
- |
M/s M.N. Construction Co. |
23,600/- |
Completed |
2023-2024 |
|
11 |
Vetting of Detailed Project Report (DPR) of project “Rehabilitation and Strengthening of 63.75m Span Steel Truss Bridge in Rudraprayag, Uttarakhand” |
Dr. Shashi Narayan |
Dr. S. Bhatra /Dr. Amardeep. |
M/s Festal Consulting Engineers Pvt. Ltd. |
1,53,400/- |
Completed |
2023-2024 |
|
12 |
Vetting of Structural Design and Drawing of school project at various sites Part-II |
Dr. Shashi Narayan |
Dr. Amardeep |
M/s Keslec Design Solution |
4,13,000/- |
Completed |
2023-2024 |
|
13 |
Construction of balance work of group housing project mix design of M25 and M30 |
Dr. A.K. Anupam |
Dr. Amardeep |
M/s P K Construction Simla Pvt. Ltd. (Hindustan Steel Works Ltd.) |
141600/- |
Completed |
2023-2024 |
|
14 |
Design mix of M25 |
Dr. A.K. Anupam |
Dr. Amardeep |
M/s Mittal Construction Unit (Hindustan Steel Works Ltd.) |
70800/- |
Completed |
2023-2024 |
|
15 |
Testing of samples for DPR work of heliports at Srinagar, Gochar and Chinyalisaur. |
Dr. A.K. Anupam |
- |
M/s RITES Ltd., Airports Division-Gurugram |
138060/- |
Completed |
2023-2024 |
|
16 |
Job mix design for WMM 7.5cm thick work WMM |
Dr. A.K. Anupam |
Mr. Neeraj Kumar |
66 Road Constr Cop (GREF), PIN: 930066, C/o 56 APO |
23600/- |
Completed |
2023-2024 |
|
17 |
Testing of cement-Physical test (Fineness, soundness, consistancy, settimg time,compressive strength. |
Dr. A.K. Anupam |
Dr. Kranti Jain |
M/s Rahee Infratech Limited ( RVNL ) |
47200/- |
Completed |
2023-2024 |
|
18 |
Testing of cement-Physical test (Fineness, soundness, consistancy, settimg time,compressive strength & sp. gravity test. |
Dr. A.K. Anupam |
Dr. Shashi Narayan Dr. Shashank Bhatra |
M/s Rahee Infratech Limited ( RVNL ) |
23600/- |
Completed |
2023-2024 |
|
19 |
1. Unconfined compressive strength with OMC & MDD2. Proctor Test |
Dr. A.K. Anupam |
- |
Hindustan Roads Technologies |
27730/- |
Completed |
2023-2024 |
|
20 |
Testing of items-WMM & CTGSB, DBM & BC, checking of road geomatic data and charge of data collection. |
Dr. A.K. Anupam |
- |
M.G. Contractor Pvt. Ltd |
302080/- |
Completed |
2023-2024 |
|
21 |
Design Mix (M-25 & M35) vetting |
Dr. A.K. Anupam |
- |
LNA Infraprojects Private Limited, Vidhya Nagar, Jaipur |
59000/- |
Completed |
2023-2024 |
|
22 |
Technical vetting/approval for GFC drawings/design documents under smart city project (GFC drawings/design) |
Dr. A.K. Anupam |
Dr. Prakash Dwivedi |
M/s RCC Developers Limited |
231280/- |
Completed |
2023-2024 |
|
23 |
km 1.00 से km 3.00 में soil testing (Liquid limit,Plastic limit CBR & grain size distribution) |
Dr. A.K. Anupam |
- |
PWD Srinagar,Uttarakhand |
82600/- |
Completed |
2023-2024 |
|
24 |
Vetting of soil investigation (Establishment of new medical college-Bulandshahar, UP) |
Dr. A.K. Anupam |
Dr. Bibhash Kumar |
NKG Infrastructure, New Delhi |
177000/- |
Completed |
2023-2024 |
|
25 |
Vetting of soil investigation (Approval/ vetting of soil investigation report for construction of Atal residential school at Sonbhadra UP) |
Dr. A.K. Anupam |
Dr. Bibhash Kumar |
RCC Developers limited, Meerut, UP |
47200/- |
Completed |
2023-2024 |
|
26 |
Material testing ( Proctor test, 7day unconfined compressive strength & grain size analysis |
Dr. A.K. Anupam |
- |
URBAN SOLUTIONS |
47200/- |
Completed |
2023-2024 |
|
27 |
Soil report vetting (vetting of GSI Dharitri building at salt lake,Kolkata |
Dr. A.K. Anupam |
Dr. Bibhash Kumar |
RK VATS |
88500/- |
Completed |
2023-2024 |
|
28 |
Third Party Visit & test (Cement, Aggregate, Concrete) for Atal residential school at Sonbhadra & Kanpur, UP |
Dr. A.K. Anupam |
- |
M/s RCC Developers Limited |
82600/- |
Completed |
2023-2024 |
|
29 |
Conducting of Job Mix Desin for WMM work (7.50 cm thick) |
Dr. A.K. Anupam |
- |
66 Road Constry Coy (GREF) |
23600/- |
Completed |
2023-2024 |
|
30 |
Test Report of Stone Boulder regarding Crushing Value, Impact Value & Water Absorption. |
Dr. A.K. Anupam |
- |
M/s Rajshri Construction, Ghaziabad |
23600/- |
Completed |
2023-2024 |
|
31 |
Job Mix Design Roads |
Dr. A.K. Anupam |
Dr. Abhinav Kumar |
M/s RCC Developers Limited |
177000/- |
Completed |
2023-2024 |
|
32 |
Vetting of Structural Drawings |
Dr. Kranti Jain |
- |
Nayak Nayak Associates |
236000/- |
Completed |
2023-2024 |
|
33 |
Trap Cage Design |
Dr. Vinod Singh Yadav |
Dr. D Sreehari |
Uttarakhand Forest Department (DFO, Pauri) |
20060/- |
In process |
2023-2024 |
|
34 |
Vehicle Design |
Dr. Vinod Singh Yadav |
Dr. Vikas Kukshal |
Uttarakhand Forest Department (DFO, Pauri) |
11800/- |
In process |
2023-2024 |
|
35 |
Testing of Oil Well Cement |
Dr. Amardeep |
Dr. Shashi Narayan |
Birla Corporation |
23600/- |
In process |
2023-2024 |
|
36 |
Time and motion study (TMS)-MGNREGA |
Dr. A.K. Anupam |
Dr. Shashi NarayanDr. Bibhash Kumar Dr. Shashank Bhatra |
Ministry Of Rural Development, Government of Uttarakhand,(MGNREG) |
2290000/- |
Report submitted |
2023-2024 |
|
37 |
Third party visit for medical college and hospital project of Bulandshahar, Atal residential school Muzzaffarnagar & Bulandshahar. |
Dr. A.K. Anupam |
- |
M/s RCC Developers limited, Meerut |
141600/- |
Under Process |
2023-2024 |
|
38 |
Third party visit for design, engineering, procurement and construction on EPC basis for establishment of new medical college at Lakhimpur Khiri, U.P. |
Dr. A.K. Anupam |
- |
NKG Infrastructure, New Delhi |
118000/- |
Under Process |
2023-2024 |
|